Refine my search
211 deliberations for your search
-
GRDF's regulated tariff for use of the public natural gas distribution networks
Deliberation of the Energy Regulatory Commission of 15 February 2024 concerning the decision on GRDF's regulated tariff for use of the public natural gas distribution networks
Decision Gas
N°2024-40
Document date: • Online date:
-
Tariff for the use of the natural gas transmission networks of GRTgaz and Teréga (ATRT8)
Deliberation of the French Energy Regulatory Commission of 30 January 2024 on the decision on the tariff for the use of the natural gas transmission networks of GRTgaz and Teréga (ATRT8)
Decision Gas
N°2024-22
Document date: • Online date:
-
Tariff for the use of the underground natural gas storage infrastructures of Storengy, Teréga and Géométhane (ATS3)
Deliberation of the French Energy Regulatory Commission of 30 January 2024 on the decision on the tariff for the use of the underground natural gas storage infrastructures of Storengy, Teréga and Géométhane (ATS3)
Decision Gas
N°2024-21
Document date: • Online date:
-
Implementation of provisions of Article 14 of Council Regulation (EU) 2022/2576 of 19 December 2022
Deliberation of the Commission de régulation de l’énergie of 30 March 2023 deciding on the implementation of provisions of Article 14 of Council Regulation (EU) 2022/2576 of 19 December 2022
Decision Gas
N°2023-90
Document date: • Online date:
-
Exemption request by the company Total Energies LNG Services France for the floating LNG terminal in Le Havre
Deliberation by the Energy Regulatory Commission of 24 November 2022 giving an opinion on the exemption request by the company Total Energies LNG Services France for the floating LNG terminal in Le Havre
Opinion Gas
N°2022-302
Document date: • Online date:
-
Decision on cross-border allocation for the Celtic Interconnector project
Deliberation by the French Energy Regulatory Commission of 3 November 2022 adopting the decision reviewing the joint decision on cross-border allocation for the Celtic Interconnector project
Decision Electricity
N°2022-277
Document date: • Online date:
-
Creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Deliberation of 7 October 2022 deciding on the creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Decision Gas
N°2022-254
Document date: • Online date:
-
Creation of a physical gas exit capacity offer at the Obergailbach interconnection point
Deliberation of 29 September 2022 relating to the creation of a physical gas exit capacity offer at the Obergailbach interconnection point
Decision Gas
N°2022-242
Document date: • Online date:
-
Draft decision on the creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Deliberation of 29 September 2022 forming a draft decision on the creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Decision Gas
N°2022-241
Document date: • Online date:
-
Request for revision of the decision to exempt Dunkerque LNG from regulated third-party access
Deliberation of the French Energy Regulatory Commission of 17 March 2022 on the request for revision of the decision to exempt Dunkerque LNG from regulated third-party access
Opinion Gas
N°2022-86
Document date: • Online date:
-
Investment request submitted by GridLink Interconnector Limited
Deliberation of the French Energy Regulatory Commission of 19 January 2022 deciding on the investment request submitted by GridLink Interconnector Limited
Decision Electricity
N°2022-12
Document date: • Online date:
-
Tariff for the use of GRTgaz’s and Teréga’s natural gas transmission networks as from 1 April 2021
Deliberation by the French Energy Regulatory Commission of 21 January 2021 deciding on the update of the tariff for the use of GRTgaz’s and Teréga’s natural gas transmission networks as from 1 April 2021
Decision Gas
N°2021-15
Document date: • Online date:
-
Tariffs for the use of public distribution electricity grids (TURPE 6 HTA-BT)
Deliberation of the French Energy Regulatory Commission of 21 January 2021 on the tariffs for the use of public distribution electricity grids (TURPE 6 HTA-BT)
Decision Electricity
N°2021-13
Document date: • Online date:
-
Tariffs for the use of public transmission electricity grids (TURPE 6 HTB)
Deliberation of the French Energy Regulatory Commission of 21 January 2021 deciding on the tariffs for the use of public transmission electricity grids (TURPE 6 HTB)
Decision Electricity
N°2021-12
Document date: • Online date:
-
Tariff for the use of regulated LNG terminals
Deliberation of the French Energy Regulation Commission of 7 January 2021 deciding on the tariff for the use of regulated LNG terminals
Decision Gas
N°2021-01
Document date: • Online date:
-
Tariff for the use of regulated LNG terminals
Deliberation of the French Energy Regulation Commission of 03 December 2020 forming a draft decision on the tariff for the use of regulated LNG terminals
Decision Gas
N°2020-092
Document date: • Online date:
-
Allocation of a derogation from the minimum levels of available capacity for exchanges between zones in the Core capacity calculation region.
Deliberation of the French Energy Regulatory Commission of 18 June 2020 on the allocation of a derogation from the minimum levels of available capacity for exchanges between zones in the Core capacity calculation region.
Decision Electricity
N°2020-140
Document date: • Online date:
-
Tariffs for the use of GRTgaz’s and Teréga’s natural gas transmission networks
Deliberation by the French Energy Regulatory Commission of 23 January 2020 deciding on the tariffs for the use of GRTgaz’s and Teréga’s natural gas transmission networks
Decision Gas
N°2020-012
Document date: • Online date:
-
Tariffs for the use of the underground natural gas storage infrastructure of Storengy, Teréga and Géométhane
Deliberation by the French Energy Regulatory Commission of 23 January 2020 deciding on the tariffs for the use of the underground natural gas storage infrastructure of Storengy, Teréga and Géométhane
Decision Gas
N°2020-011
Document date: • Online date:
-
Equalised tariff for the use of GRDF’s public natural gas distribution networks
Deliberation by the French Energy Regulation Commission of 23 January 2020 deciding on the equalised tariff for the use of GRDF’s public natural gas distribution networks
Decision Gas
N°2020-010
Document date: • Online date:
-
Derogations from the minimum levels of available capacity for cross-zonal trade in the Core, Italy North and South-West Europe capacity calculation regions
Deliberation of the CRE (French Energy Regulatory Commission) dated 12 December 2019 granting derogations from the minimum levels of available capacity for cross-zonal trade in the Core, Italy North and South-West Europe capacity calculation regions
Decision Electricity
N°2019-273
Document date: • Online date:
-
Functioning of the single gas market area in France
Deliberation of the Energy Regulatory Commission of 12 December 2019 relating to the functioning of the single gas market area in France
Decision Gas
N°2019-276
Document date: • Online date:
-
IFA/IFA 2 access rules in the event of Great Britain remaining or leaving the single day-ahead market coupling
Deliberation of the Commission de régulation de l’énergie (French Energy Regulatory Commission) dated 17 October 2019 approving the change to the IFA/IFA 2 access rules in the event of Great Britain remaining or leaving the single day-ahead market coupling
Approbation Electricity
N°2019-227
Document date: • Online date:
-
Change to the ElecLink interconnection access rules in the event of Great Britain remaining or leaving the single day-ahead market coupling
Deliberation of the Commission de régulation de l’énergie (French Energy Regulatory Commission) dated 17 October 2019 approving the change to the ElecLink interconnection access rules in the event of Great Britain remaining or leaving the single day-ahead market coupling
Approbation Electricity
N°2019-226
Document date: • Online date:
-
Cross-border cost allocation for the Celtic Interconnector project
Deliberation by the French Energy Regulatory Commission of 10 October 2019 adopting the decision reviewing the joint decision on cross-border cost allocation for the Celtic Interconnector project
Decision Electricity
N°2019-022
Document date: • Online date: